A large yacht (600 GT, 50m LOA) was berthing at a marina in South East Asia. Wind and tidal conditions were benign and the arrival and mooring procedures followed the yacht’s normal routine. During the mooring operation the yacht was being manoeuvred from the port bridge wing…